Standard Laboratory Configuration Method

- Nov 18, 2019-

  1. Center of the laboratory Here is the space for setting up the central test bench. Usually, the washing table is set on the longitudinal side or middle of the central test bench. The reagent rack is set on the table, and the universal suction hood can also be set.

  2. Right side window Set side experimental table, work table, sky platform, side table reagent rack, universal combination frame, hanging cabinet

  3. Right side door Set the fume hood, test bench, washing station, drying rack, medicine cabinet, locker (the position of the fume hood should be convenient for the connection of the ventilation duct).

  4. left and right doors are usually placed with safety equipment, emergency showers, eye washers, fire extinguishers, etc.

  5. Left side door Set the fume hood, side test bench, side table reagent rack, washing station, wall cabinet, and install large equipment and equipment.

  6. Left side window Set the side table, work table, side table reagent rack, place for large equipment and equipment.

  7. Position of the window The space under the window can be set up on the side table, test bench, and microscope table, and the operation is good.